Infrastructure
Ongoing
National Authority for Tunnels (NAT)
Greater Cairo, Egypt
Partner in a Consortium with French and Egyptian Companies
This is a repeat business project.
Through Egyptian French Consortiums, Orascom Construction played an integral role in the development of Greater Cairo Metro Lines II and III since the late 1980s.
Line 2:
The Greater Cairo Metro Line 2 was characterized by the utilization of TBM for the first time in the Middle East. Orascom Construction successfully delivered in a consortium with Cogifer works on seabet appphases 1 and 2 of this line with a total length of 50.5 km.
Line 3:
Line 3 is linking between the east and west of Cairo to become the first transversal line. Orascom Construction participated in the execution of many packages for phases 1 and 2, while it is currently working on phases 3 and 4 of the Greater Cairo Metro Line 3. Line 3 Phase 4B was inaugurated in 2020.