Infrastructure
2018
Reservoirs and Grand Barrages Sector (RGBS) of the Ministry of Water
Assiut, Egypt
Partner in a JV with Vinci and Arab Contractors
seabet slots gamesConstruction of a new barrage across the Nile River consisting of two navigation locks (17 m width x 156 m length), eight sluiceway bays, 32 MW powerhouse, in addition to an administration building and other ancillary buildings.